| Gallery - |
 |
 |
| We are mounting junction boxes just under the second floor so we can take power up to the plugs on the second floor and down to the first floor. |
These lateral beams are spaced every six feet to support the second floor fo the building. They are tied into the columns. |
 |
 |
| Here is a better view of the lateral beam, tied into the vertical columns. |
The beams are supported by round timbers while they are being formed and poured. |
 |
 |
| The plugs have to be cut into the existing walls. |
Here are the guys forming the rebar for the lateral beams. |
 |
 |
| Close up of the rebar cages for the lateral beams. |
Dogs are people too. |