| Gallery - Update - 03.29.08 |
 |
 |
| Tim cutting pieces |
Tim cutting pieces |
 |
 |
| Tim cutting pieces |
Not sure what this is |
 |
 |
| Removing old fence posts. We will use these inside for the stairway inside the veranda. |
Tim cutting more pieces for the mold for the well ring casting. |
 |
 |
| Cutting a curve very carefully. |
Ralston cutting pieces (lots of pieces) |
 |
 |
| Working off of the generator because the power cut off for about two hours. |
The generator is working great. Keeps the guys working during frequent power outages. |
 |
 |
| Removing the fence posts to make way for the driveway gate. |
Fence removed and setting temporarily in the front yard. |
 |
 |
| Cutting wood to make the forms for the dining room arch. |
You can do anything with a machete. |
 |
 |
| Overhead forms for the beams |
Not sure what this is. |
 |
 |
| Closer shot of overhead beams. We are also putting a perimeter beam under the second floor |
Dog taking a cat nap (if that makes sense). |
 |
 |
| Closer view of the dog |
Working to remove another fence post. |
 |
 |
| Well ring casting mold almost completed |
Starting to set columns for the front fence. |
 |
 |
| Rebar cage at the base of each column |
Concrete finished for arch leading into the dining area. This will be really beautiful. |
 |
 |
| We put up a temporary gate to prevent all the walk-through traffic that used this as a thoroughfare. |
Another view of the well casting mold. |
 |
 |
| Kim and Leticia |
Bricks up on the front fence. |
 |
 |
| Sidewalk will be part of the driveway and new sidewalk will be to the left of the old one. |
Pieces of rebar marking the boundary line where we are building the fence. |
 |
|
| View of the fence from inside the front yard. |
|