| Gallery - Second Floor Poured - 06.04.08 |
 |
 |
| Shoveling concrete into buckets |
The water tank |
 |
 |
| Marvin running the mixer |
Shoveling stone into buckets |
 |
 |
| Shoveling sand into buckets |
Handing concrete up to the second floor |
 |
 |
| Dumping sand into the mixer |
Dumping sand into the mixer |
 |
 |
| The big scene |
Adding cement to the mixer |
 |
 |
| Handing the cement up to the second floor |
Checking the mix |
 |
 |
| Handing the buckets back down |
Finish troweling the cement |
 |
 |
| Checking depth on the cement |
On the second floor |
 |
 |
| Finishing the cement (rough) |
Handing buckets of cement up |
 |
 |
| Handing buckets of cement up |
Marvin and the mixer |
 |
 |
| Vibrating the concrete |
Ready to fill buckets |
 |
 |
| Throwing buckets back down |
Marvin and the mixer |
 |
 |
| Marvin and the mixer |
"Boom" having a good time |
 |
 |
| Resting between buckets |
Waiting for the next batch |
 |
 |
| Lila Weaver |
Kim and Lila and Alice |
 |
 |
| Alice Weaver |
Lila Weaver |